$272m wind haul: How one Chinese firm booked its subsea future until 2028
Jiangsu Hengtong Optic-Electric secures RMB 1.831bn ($272.4m) in offshore wind and subsea cable contracts across China.
Jiangsu Hengtong Optic-Electric, a Chinese specialist in subsea cables and offshore wind projects, has finalized a series of contracts valued at RMB 1.831 billion ($272.4 million). The agreements cover a range of services, including submarine cable installation, turbine assembly, and ongoing maintenance for offshore wind farms.
The company’s recent contracts include major domestic initiatives such as the 1.2-gigawatt Datang Hainan Danzhou offshore wind farm, the Shenergy Hainan CZ2 demonstration project, and the Changle offshore wind development. Additionally, Jiangsu Hengtong will oversee large-component replacements and turbine installations for the Three Gorges Yangjiang Qingzhou 5 and 7 projects, further solidifying its role in China’s expanding offshore wind sector.
Key domestic projects drive growth: offshore wind contracts
Beyond its domestic operations, the firm has secured projects in Europe, the Americas, and the Asia-Pacific region. These international contracts focus on supplying submarine cables, related accessories, and essential equipment for marine energy infrastructure.
The company’s order book reflects strong demand, with RMB 22 billion in energy interconnection projects and RMB 7 billion ($1.04 billion) in marine communications already on its ledger. Production capacity for subsea cables is fully allocated through 2027 and 2028, signaling sustained growth in the sector.
Sign up free to ask CAMAL AI for a summary, the key points or anything else about this story.
Related stories
Financial Ports Newsletter
The maritime economy, every morning
Ports, shipping and freight markets in one short email. Free.
