CLAVE 1 / 4Port of Santa Cruz de Tenerife completes its first LNG refuel operation using tanker trucks.
CLAVE 2 / 4The 600 MWh supply to Baleària’s Mercedes Pinto used the Multi Truck to Ship (MTTS) method.
CLAVE 3 / 4Two tanker trucks achieved a 700-litre-per-minute pumping flow during the operation.
CLAVE 4 / 4The Mercedes Pinto is Baleària’s 12th ship equipped with dual engines for natural gas and biogas.
Lee la noticia completa con todos los detalles