CLAVE 1 / 4Aarhus completes Denmark’s first shore power trial for containerships with Eimskip’s Dettifoss.
CLAVE 2 / 4The 2,150-TEU vessel received 6.5 MWh during a 10-hour connection at the container terminal.
CLAVE 3 / 4Facility will cut noise and particle pollution, aligning with 2030 EU at-berth regulations.
CLAVE 4 / 4Up to four box ships can plug in simultaneously once fully operational in January 2027.
Lee la noticia completa con todos los detalles