Financial Ports

Drones Slash Offshore Wind Downtime by 20%—How RWE Did It

CLAVE 1 / 49 tonnes of cargo moved by Ampelmann’s drone fleet in six weeks at RWE’s Triton Knoll offshore wind farm.

CLAVE 2 / 4250 flights completed, with payloads of up to 80 kg per trip.

CLAVE 3 / 4Technician tool time increased by 15-20% through night-time drone operations.

CLAVE 4 / 4Volatus Aerospace contracts to commercialise 100 kg heavy-lift drones for offshore wind maintenance.

Lee la noticia completa con todos los detalles

Leer el artículo