CLAVE 1 / 4$1.8 billion project will be the first new container terminal on the US Gulf Coast in nearly two decades.
CLAVE 2 / 4Terminal will handle two ultra-large container vessels simultaneously, each exceeding 24,000 TEU.
CLAVE 3 / 4Current port infrastructure limited by 52-metre air draft of the 1958 Crescent City Connection Bridge.
CLAVE 4 / 4Projected to increase annual capacity from 1 million TEU to 1.2 million containers over 25 years.
Lee la noticia completa con todos los detalles