CLAVE 1 / 4Botas has opened a tender for a 940-day time charter of an LNG carrier with capacity between 173,600 and 175,000 cu m.
CLAVE 2 / 4The vessel must be built in 2015 or later, capable of exceeding 19 knots, and have a maximum boil-off rate of 0.1% per day.
CLAVE 3 / 4Bids are due by October 15, with an option for Botas to extend or shorten the charter by up to 60 days.
CLAVE 4 / 4The tender follows Botas’s April move to seek prequalification bids for two 174,000 cu m LNG carriers from South Korean builders.
Lee la noticia completa con todos los detalles