CLAVE 1 / 4McDermott secures a $1bn-plus EPCI contract from ADNOC for the Umm Shaif gas project.
CLAVE 2 / 4The deal includes construction of a jacket, topside, and brownfield modifications—among the heaviest offshore modules ever installed in the Middle East.
CLAVE 3 / 4Fabrication will take place at McDermott’s joint venture yard in Qingdao, with engineering led from the UAE.
CLAVE 4 / 4The project aims to maximise gas recovery and increase production at the Umm Shaif field.
Lee la noticia completa con todos los detalles