CLAVE 1 / 4A sterntubeless shaftline system creates 660m³ of extra cargo space in Suezmax tankers.
CLAVE 2 / 4Shipbuilders save US$33,000 in initial oil costs and US$11,500 annually in operating expenses.
CLAVE 3 / 4The system eliminates the need for drydocking during bearing inspections, reducing downtime.
CLAVE 4 / 4Annual fuel savings reach approximately US$5,100 due to reduced shaftline drag.
Lee la noticia completa con todos los detalles