CLAVE 1 / 4Havila Shipping signs three-year contracts for two platform supply vessels (PSVs).
CLAVE 2 / 4Deal with Neo Next + Energy’s UK arm covers six vessel-years of firm work.
CLAVE 3 / 4Vessels Havila Fanø (2010-built) and Havila Herøy (2009-built) to operate in UK North Sea sector.
CLAVE 4 / 4Contracts include three optional one-year extensions beyond September 2029.
Lee la noticia completa con todos los detalles