Financial Ports

16,000-Tonne Oil Giant Arrives in Shetland: The End of a 42-Year North Sea

CLAVE 1 / 4The 16,000-tonne North Cormorant platform topsides is the largest ever brought into Lerwick Harbour for decommissioning.

CLAVE 2 / 4The Pioneering Spirit, at 382 metres long, is the world’s largest heavy-lift vessel, capable of removing platforms weighing up to 60,000 tonnes.

CLAVE 3 / 4The decommissioning project is expected to last 18 months, with up to 97% of materials recycled.

CLAVE 4 / 4North Cormorant produced 467 million barrels of oil during its 42-year operational life in the North Sea.

Lee la noticia completa con todos los detalles

Leer el artículo